Civil Contractor Software: Dockets, Plant and Progress Claims
Procore and Fieldwire are unpriced in our files, so we show nothing; request written quotes from each counting users, projects and the modules you need.
A civil contractor's money moves through dockets, plant hours and progress claims. We cover those records, the daily diary and subcontractors, and how to compare written quotes since no price is printed for the two names.
- ✓ No guessed prices, only a quote method
- ✓ Dockets, plant and diaries explained
- ✓ A fill-in sum for the first year
- ✓ Free 20 minute assessment, quote in writing
Set up your own tool
- ✓ Describe the tool you want and preview what your dashboard will hold
- ✓ Confirm your email and leave a number so we can ring you back
- ✓ No card and no password to sign up
Prices from the suppliers
We hold no saved supplier price for this topic, so none is quoted here.
Custom AI Dashboard: Quoted in writing after a free 20 minute assessment, built for what you need.
Nothing here is a price or a claim about which option is cheaper. Ours is quoted in writing after the free assessment.
About this service
Earthworks and civil work differ from building. The work is in the ground, measured in cubic metres and hours of machines, and the evidence is a stack of paper: truck dockets, plant timesheets, survey sets and the site diary. Margin is made or lost in whether those are captured the day they happen.
Procore and Fieldwire are two names in construction software, and we hold no saved price for either. We say nothing about their features. Safety obligations, contract forms and payment rules differ by country and state; keep safety documents in a system that fits your regulator, and take your own contract advice.
- ✓ The reason no price is shown
- ✓ What dockets and diaries must hold
- ✓ A yearly sum with blanks
- ✓ Rent the core, build the glue
- ✓ Civil and earthworks contractors
- ✓ Project managers and supervisors
- ✓ Office staff preparing claims
- ✓ Not contract or safety advice
Price position on the two construction platforms
Procore: nothing held. Fieldwire: nothing held. We print no figure for either.
Construction platforms are often charged by annual construction volume, project count or user, and a small civil firm may find them sized for larger builders. The wider reasoning is in our business software cost guide.
Give each supplier a brief: projects running at once, an annual turnover band if asked, office users, supervisors, and subcontractors needing access. Ask whether subcontractors who only upload dockets or forms are charged as users.
Dockets, plant hours and the daily capture
A docket is a small piece of paper worth real money: a load of fill, a truck day, a tipping receipt. They arrive late, are lost in cabs and are disputed weeks later. The best fix is capture at source with a phone photo and a few fields, tied to the job and the supplier.
Plant hours follow the same pattern. Excavators, rollers and trucks carry hourly rates, and an operator's daily sheet decides what is charged to which job. Ask whether the product holds your plant register with rates, captures hours per machine per job, and flags machines with no hours on a working day. Equipment rental software deals with hire in and out, and asset tracking shows where plant is.
The daily diary and the evidence behind a claim
A diary written the same day is persuasive; one written from memory is not. It should record weather, labour on site, plant, quantities placed, instructions received, visitors and incidents, with photos tagged by location. Delay and variation claims depend on these records, and so does any dispute about what was instructed.
Ask how the diary links to other records. A variation noted in the diary should be able to become a variation register entry without retyping. Check how long photos are kept and how they are named. For long linear jobs such as roads and pipelines, check that locations can be stated as chainages or lots and not just street addresses, and see the construction management guide for the building-side equivalent.
Quantities, progress claims and subcontractors
Progress claims are the cash cycle. A claim lists work done against the contract schedule, plus approved variations, less retention and previous claims. Surveyed quantities should feed it. The software should keep the schedule, record claimed and certified amounts, and show what remains unpaid.
Subcontractors bring their own claims and their own paperwork. Ask how they submit, how you approve, and how the amounts reach your accounts. Your accounting software is the end point, and the surveying business guide shows how survey outputs are handled on the other side of the fence. We make no statement about payment law, which differs by place.
A civil contracting year as a sum, with blanks
Complete each line with a figure from a written quote.
- Platform: monthly fee ____ x ____ users x 12 = ____, or a project-based fee of ____.
- Field app licences for supervisors: ____ each x ____ = ____.
- Docket or plant module if sold separately: ____ monthly x 12 = ____.
- Loading plant and supplier lists, set-up, training: ____.
- Link to your accounts: ____.
Total the lines and weigh them against the leakage you suspect now: unbilled plant hours and disputed dockets over one month. If winning back a few hours of plant a week covers the fee, the case is made. Renting versus building software gives the test for custom work.
Mistakes civil contractors make with software
A system built for a high-rise project can be heavy for a road job; test with a real small project. Another mistake is accepting photos with no job tag, which defeats the point. A third is not agreeing with subcontractors how they will submit before the project starts, so paper creeps back.
A further trap is rolling out to every crew in one week. Pick one project and one supervisor, run dockets and the diary through the platform for a month alongside the old paper, and compare what each version would have claimed. The gap is the evidence for or against the fee.
Rent the platform, build the glue
Rent a construction platform for documents and forms; we supply the glue. That means a custom dashboard of plant utilisation, docket totals against the schedule and claims status, workflow automation that sends a docket photo to the right job, an AI agent drafting a weekly progress summary for the project manager to approve, a custom tool for a measuring job nothing fits, and a business systems audit.
Questions to ask any construction platform
- Does the field app work offline? Cuttings and pipelines are often out of range.
- Can a subcontractor upload a docket without a paid seat?
- How are plant rates stored, and can they change mid-project with a record of the change?
- What does a progress claim export look like? Ask for a sample you can open in a spreadsheet.
- Who owns the photos and documents when the project closes?
- What happens to a project's records after you stop paying?
Run a trial on one live job for two weeks, with the supervisor who dislikes paperwork most. If that person uses it, the others will.
Where we work with earthmoving firms
Contractors elsewhere are as welcome as those at home in Australia, so tell us where your sites are. Describe how dockets, plant hours and diary notes reach the office through contact or get started; the opening 20 minute assessment is free, builds are quoted in writing before any work, and we have no rate card.
Related pages to read next
- Construction management: jobs, subcontractors and cost
- Equipment rental software: bookings, returns and servicing
- Asset tracking software: where equipment is and who has it
- Fleet management software: vehicles, trips and servicing
- Surveying business software: a related guide
- Accounting software compared: the books side of the business
- Custom dashboards: plant use and claims status on one screen
- Rent or build software: when building beats renting
- Personal trainer software: Trainerize, PT Distinction, TrueCoach and Everfit prices by client count, worked for 8 and 30
- NDIS software: NDIS software for providers explained: rosters, shift notes, budgets and claiming. No price
- Zapier expert: A buyer's guide to hiring a Zapier expert: what the work covers, how to compare written
- Cold chain monitoring software: Cold chain monitoring software explained: sensors, excursion alerts and records. No price
- Form to spreadsheet: How to send web and online form answers straight into a spreadsheet: column design
- Scrap yard software: Scrap yard software guide: weigh tickets, grades, seller records and payouts. No saved price
- Winery management software: Winery software explained: cellar records, wine club, cellar door sales and shipping. No price
- Cash flow forecasting software: Published prices for Fathom, Float and Futrli, the year cost of Float in A$, and when a custom
- Dog grooming software: Gingr, MoeGo, Pawfinity, DaySmart Pet and Time To Pet prices from saved readings, a solo and a
Claim your free assessment
Two short steps. Name and email, and tell us what is slowing you down. No card, no obligation.
Take the next step and sign up
- ✓ Tell us what to build and see what is inside your dashboard
- ✓ Your email confirmed, your phone number so we can ring you
- ✓ No card and no password to sign up
Sources for the figures
- Procore: nothing saved, never read (reads-6.json, 22 October 2026).
- Fieldwire: nothing saved, never read (reads-6.json, 22 October 2026).
- All other text here describes the category in general and offers a worked method with blanks. No other supplier was read, and we claim nothing about any product's features or standards.
- Our prices: none published, see the pricing page. General cost guidance: business software costs.
Before you ask
How much does civil contractor software cost?+
Our files hold no cost for Procore or Fieldwire, so none appears. Ask each for a quote based on projects, users and the modules you need.
What does Procore cost?+
Nothing is stored for Procore in our files, so no figure is printed. Ask what the quote depends on, such as project volume, and whether subcontractors count.
What does Fieldwire cost?+
Nothing is stored for Fieldwire in our files either, so no figure is printed. Request a written quote with the same project and user counts you gave the other supplier.
How should truck dockets be captured?+
Capture them at source with a phone photo and a few fields tied to the job and supplier, so they are not lost in cabs or disputed weeks later.
What goes in a civil site diary?+
Weather, labour, plant, quantities placed, instructions received, visitors, incidents and tagged photos, written the same day so it can support later claims.
Can a spreadsheet run plant hours?+
For a few machines, yes, but disputes and claims need the evidence attached, which a spreadsheet does not manage well as jobs multiply.
Should a civil firm build its own system?+
No, not the forms and documents, which a platform handles. Build only the plant, docket and claim reports that products do not shape to your jobs.
Can you help with civil contractor software?+
Yes: describe how plant hours and dockets reach the office and we will show where a dashboard, an automation or a small custom tool could help. The first assessment is free and builds are quoted in writing.
More to read, no sign-up
Why choose Custom AI Dashboard
- One price for the whole team. StockRoom is free to 50 products, then A$9, A$44 or A$89 a month, and nobody is charged per person.
- The price is on the page. About a quarter of the companies we compared hide theirs.
- Held to rules that must always be true. StockRoom's stock records are tested against 17 rules, such as cost of goods always reconciling with the stock, and they are checked after every single movement in the simulated businesses we run.
- Tested before it is sold. The engine behind our next products runs more than 27,000 automated checks on the trade desk alone, and a product is not sold until it has run in a simulated business of its kind.
- Your data comes in from a spreadsheet or the tool you use now, and the importer says what it did with every row.
Our own StockRoom prices, as shown on its site, checked in its pages on 24 October 2026.